Real Time Location Services

Real Time Location Services (RTLS)

From staff response times to asset location - everything at your fingertips.

In today’s busy healthcare environments, Advance Care’s Real Time Location Monitoring helps you deliver safer, more efficient care while giving peace of mind to residents and their families. Using discreet, built‑in tags and staff badges, the system provides accurate, real‑time data that supports confident decision‑making and faster responses when it matters most.

  • Clear records of staff response times - know who attended each call and when.

  • Detailed accuracy - dual technology ensures reliable room level detection.

  • Built‑in as standard - no costly 3rd‑party integrations or extra infrastructure required.

  • Long lasting, low maintenance devices - asset tags and badges designed for years of dependable use.

Staying on top of alerts

Not only is your care team notified of any alert or call, but the Advance Care Nurse Call System utilises staff name badges to carefully monitor and log when and who responds to every resident alert. All badge visits to a room are recorded, whether there’s a call or not, giving you and residents’ families peace of mind.

The Auto Presence feature automatically detects when a nurse enters a room in response to a call, cancels the active request, and changes the over-door light colour. This saves time, reduces errors and improves efficiency.

Team members can also use their badges to call in additional support at the press of a button, whenever it’s needed.

Room status display for the Advance Care system

Unparalleled accuracy

The Advance Care system boasts cutting-edge technology, offering detailed accuracy. It uses what’s known as a 'dual technology' to deliver this. Infrared to guarantee 100% room level accuracy and RF to cover areas where no Infrared infrastructure exists.

You can trust that the data you receive is precise, allowing for confident decision-making and a higher standard of care.

Real time location screen for the Advance Care system

Asset tagging: Finding what you need, when you need it.

A common frustration in hospitals and aged care facilities is locating equipment when and where you need it.

One of the key use cases for real time location monitoring is asset tagging. Say goodbye to the frustration of hunting for equipment.

These smart tags provide real-time location data, helping you instantly locate vital assets like infusion pumps, wheelchairs, or defibrillators.

Defribrilator

Built right into the system

All the required tech is built-in to all Advance Care nurse call equipment as standard. Meaning infrastructure costs are effectively zero.

This embedded technology allows for functionality not possible with third-party integrations.

The software history logs will show unscheduled or informal visits, as well as standard presence and cancellation of calls. 

Advance Care screens

Accessories to make it all happen

  • Staff ID badge with built-in personal assist and duress alert functions.

  • Wearable pendant for residents or patients while on the move.

  • Waterproof wristband designed for residents at risk of wandering.

  • Asset tag with a tamper-alert that triggers if removed.

All come with extended battery life.

RTLS accessories for the Advance Care system

Extended battery life

Say goodbye to short-lived batteries in wireless products.

The Advance Care asset tags, RF pendants, wristbands and Staff Badges have been meticulously engineered to maximise battery longevity while maintaining top-notch performance. Asset tags are set to last between 4 to 5 years, depending on movement, ensuring reliability over the long haul.

Additionally, Staff Badges offer the convenience of USB rechargeability, needing only a recharge every 2 – 3 months, making them a hassle-free choice for your team. 

Charger icon